Three proposals arrive for the same 60,000-square-foot warehouse roof in Madison County. Two of them describe the membrane, the insulation thickness and the fastening pattern, and say nothing at all about fire. The third puts “Class A fire-rated assembly” in bold near the top of page one.
A building owner reading those three documents has to decide whether the third contractor is being thorough or is charging for something the other two correctly left out. The instinct is to assume the fire rating is an upgrade, and that the proposal naming it is the careful one. Sometimes that is true. More often, the sentence is telling you about a listing the manufacturer already holds for an assembly that costs no more than the unlabeled one.
What the code actually requires is in a table that takes about thirty seconds to read, and it asks for less than most people expect. Table 1505.1 of the 2021 International Building Code sets the minimum roof covering classification. The table has nine columns, one for each type of construction, and the answer in every one of those columns is either Class B or Class C. Class A does not appear anywhere in it.
The edition matters, so it is worth being exact about it. Alabama Administrative Code rule 355-12-1-.01 states that the minimum building standard code adopted by the Division of Construction Management is the 2021 International Building Code, and lists the exceptions where provisions of the 2024 edition are substituted or added instead. Those exceptions are specific and short: the Chapter 2 definition of flammable gas, Table 307.1(1), Sections 307.4, 307.5 and 414.2.5, Table 414.5.1, and two added provisions at 414.2.5.4 and Table 414.2.5(3). None of them is in Chapter 15 or Chapter 6, so the fire classification provisions discussed here are the 2021 text as published. The rule was last amended effective 17 March 2025, and before that effective 14 April 2022.
Which code and which edition govern a particular project is a separate question, because the authority issuing the permit is not always the state. For a building inside the Huntsville city limits that is a question for the city, and it is worth asking early rather than assuming.
So the question a bid should be answering is not “is this Class A”. It is “which construction type is this building classified as, and does the proposed assembly carry a listing at or above what that column requires”. Those are different questions with different answers, and only the second one can be checked against a document.
Rooftop solar is where the question can reach scope and cost rather than paperwork. Section 1505.9 sends a rooftop mounted photovoltaic system to its own standard and then makes its fire classification comply with the same Table 1505.1, read off the same construction type. An array proposed by an electrical contractor, priced as an energy project, has a roofing requirement attached to it that nobody on the electrical side of the job may have mentioned.
The class is a test result, not a material
Section 1505.1 divides roof assemblies into classes and then says how a building earns one: “Class A, B and C roof assemblies and roof coverings required to be listed by this section shall be tested in accordance with ASTM E108 or UL 790.” Fire-retardant-treated wood roof coverings are additionally tested to ASTM D2898. Skylights and sloped glazing complying with Chapter 24 or Section 2610 are excepted from the section.
The three classes are defined in the plainest possible terms. A Class A assembly is one “effective against severe fire test exposure” (1505.2). Class B is “effective against moderate fire-test exposure” (1505.3). Class C is “effective against light fire-test exposure” (1505.4). Each of the three also has to be listed and identified as that class by an approved testing agency, which means the class is not an opinion a contractor forms about a material. It is a result somebody recorded.
ASTM E108 and UL 790 are not openly published, so this guide does not characterize what the test procedure involves beyond what the code says about it. That limitation matters less than it sounds, because the building owner’s side of the question is entirely about the listing: which class, from which agency, for which assembly.
Section 1505.5 supplies a fourth category. “Nonclassified roofing is approved material that is not listed as a Class A, B or C roof covering.” Nonclassified is a real category rather than a failure, and the code uses it as one. It is simply not permitted where the table requires a class.
Table 1505.1 never asks for Class A
The table is titled “Minimum roof covering classification for types of construction”, and it runs across nine columns: IA, IB, IIA, IIB, IIIA, IIIB, IV, VA and VB. Worth noting that Type IV appears as a single column here, even though Table 601 in Chapter 6 splits Type IV into IV-A, IV-B, IV-C and IV-HT for fire-resistance purposes.
The row of minimum classes reads:
- Class B for Types IA, IB, IIA, IIIA, IV and VA
- Class C for Types IIB, IIIB and VB
That is the whole requirement. Six construction types need a Class B covering as a minimum and three need only Class C. A Class A listing exceeds the code minimum for every building the table covers, which is why Section 1505.2 is able to say that Class A roof assemblies “shall be permitted for use in buildings or structures of all types of construction” without any qualification.
For most low-slope commercial work in North Alabama, the practical consequence is narrower still. The common single-ply and modified bitumen assemblies sold for warehouse, retail and light industrial roofs are generally offered with manufacturer fire listings, and the class a particular assembly carries depends on the whole build-up, not the membrane alone. Insulation type, cover board, attachment method and deck all sit inside the tested assembly. That is the reason a bid cannot honestly promise a class without naming the assembly it belongs to.

So which construction type is the building?
This is the question that decides the answer, and it is not one to settle by looking at the walls.
Chapter 6 controls it. Section 602.1 requires buildings to be classified in one of five construction types defined in Sections 602.2 through 602.5, with building elements carrying fire-resistance ratings not less than those in Table 601. Types I and II are those in which the building elements specified in Table 601 are of noncombustible materials, except as Section 603 permits. Type III has noncombustible exterior walls and interior elements of any material the code permits. Type IV is mass timber or noncombustible. Type V is “any materials permitted by this code.”
The A and B suffixes are protection levels rather than material changes. For a roof, the difference is stark: the roof construction row of Table 601 requires a 1-hour fire-resistance rating in Type IIA and zero hours in Type IIB. Carry that into Table 1505.1 and the same step down moves the roof covering from Class B to Class C.
Then there is Section 602.1.1, which is the sentence that catches people out. A building “shall not be required to conform to the details of a type of construction higher than that type which meets the minimum requirements based on occupancy even though certain features of such a building actually conform to a higher type of construction.” A steel-framed warehouse with masonry walls and an unprotected bar joist roof can look substantial and still be classified Type IIB, because IIB is all its occupancy required. Its minimum roof covering class is therefore C.
So the construction type comes off the approved construction documents and the permit record for the building, not off an inspection of the finished structure. Any owner who does not know theirs can find it there, and an owner of an older building may find the classification was set under a much earlier code edition.
Where a Class A assembly comes from
Section 1505.2 names several Class A assemblies outright, without a test report attached to the individual job, and the list is worth reading because most of it is ordinary construction:
- coverings of brick, masonry, or an exposed concrete roof deck
- ferrous or copper shingles or sheets, metal sheets and shingles, clay or concrete roof tile, or slate installed on noncombustible decks
- ferrous, copper or metal sheets installed without a roof deck on noncombustible framing
- copper sheets of not less than 16 ounces per square foot over combustible decks
- slate installed over ASTM D226, Type II underlayment over combustible decks
An exposed concrete roof deck is a Class A roof assembly on its own terms. So is a standing-seam metal roof over a noncombustible deck. Neither is exotic, and neither carries a premium for the fire class specifically.

The other two provisions in Section 1505 that reach commercial buildings are easy to miss. Section 1505.7 covers special purpose wood shingle and shake roofing, with its own gypsum underlayment requirement. Section 1505.10 sends landscaped roofs to Sections 1505.1 and 1507.15 and requires installation in accordance with ANSI/SPRI VF-1, so a green roof does not escape the fire classification requirement by being a planting bed.
Rooftop solar reads off the same table
Two sections of the code put photovoltaics into the fire classification question, and they do it differently depending on what the panels are.
Section 1505.8 covers building-integrated photovoltaic products installed as the roof covering. Those are tested, listed and labeled for fire classification in accordance with Section 1505.1 itself, which is to say they are treated as the roof covering they have replaced.
Section 1505.9 covers the far more common case: a rooftop mounted photovoltaic panel system sitting above an existing or new roof. Those systems “shall be tested, listed and identified with a fire classification in accordance with UL 2703,” listed systems have to be installed in accordance with the manufacturer’s installation instructions and their listing, and the fire classification “shall comply with Table 1505.1 based on the type of construction of the building.”
Read that last clause carefully, because it is the one with consequences. The array’s required class is set by the building’s construction type, exactly as the roof covering’s is. A Type IIB warehouse needs a Class C system; a Type IIA building needs Class B. UL 2703 is not openly published either, so this guide does not characterize its procedure, but the document the owner needs is the same shape as before: a listing identifying the system and its class.

The practical trap is organizational rather than technical. Rooftop solar is usually sold, designed and installed by people who are not roofers, on top of a roof whose warranty, assembly and fire listing belong to somebody else. Section 1505.9 makes the array’s fire classification a condition of the installation, and the racking manufacturer is the party who holds it. Asking for it before the panels are ordered costs nothing. Asking afterwards can mean a module type change.
The label on the pallet is the proof
Section 1506 is where the paperwork becomes physical. Section 1506.1 requires roof coverings to be applied in accordance with Chapter 15 “and the roof covering listing as required by Section 1505.” Section 1506.3 goes further: roof-covering materials have to be delivered in packages bearing the manufacturer’s identifying marks and the approved testing agency labels required by Section 1505, and bulk shipments have to arrive with the same information on a certificate or bill of lading.
That is a check an owner can make without climbing a ladder. On the morning materials land, the pallets and rolls either carry the manufacturer’s marks and the approved agency labels or they do not. What that confirms is narrower than it first appears: the labels show that listed materials were delivered. The class of the assembly those materials go into is established in the listing and the submittal package, not printed on each component. The delivery is a useful cross-check against the paperwork rather than a substitute for it.
Three footnotes to Table 1505.1, and the rule that disposes of one
Table 1505.1 carries three footnotes, and two of them can move the answer.
The first says the table applies “unless otherwise required in accordance with the International Wildland-Urban Interface Code or due to the location of the building within a fire district in accordance with Appendix D.” Both of those routes depend on local adoption rather than on the book. Section 101.2.1 of the code settles how to read that: “Provisions in the appendices shall not apply unless specifically adopted.” So whether Appendix D fire districts are in play for a given project is a question for the jurisdiction issuing the permit, and the answer is not deducible from the code text.
The second permits nonclassified roof coverings on Group R-3 and Group U occupancies where there is a minimum fire-separation distance of 6 feet measured from the leading edge of the roof. That is houses and accessory structures, not commercial buildings, and it is the reason a residential re-roof conversation about fire class usually goes nowhere.
The third footnote hangs off the three Class C cells and is the only place the table relaxes further. Buildings not more than two stories above grade plane, with not more than 6,000 square feet of projected roof area, and with a minimum 10-foot fire-separation distance from the leading edge of the roof to a lot line on all sides except street fronts or public ways, are permitted roofs of No. 1 cedar or redwood shakes and No. 1 shingles constructed in accordance with Section 1505.7. Three conditions, all measurable, and a small commercial building in a tight infill location will fail the 10-foot one before it gets to the other two.
What a roofer checks before answering the question
The order matters, because each step narrows what the next one has to consider.
The construction type comes first, from the permit record or the approved construction documents, because the table cannot be read without it. Then the deck, since several of the Class A routes in Section 1505.2 turn on whether the deck is noncombustible and the Table 601 roof row turns on whether the roof construction is rated. Then the existing covering and the number of layers, which belongs to the reroofing provisions rather than to Section 1505 but decides what assembly is available.
Only then does the proposed assembly get looked at as a listed system: membrane, cover board, insulation, attachment and deck as one tested combination, with a class attached to that combination and not to the membrane brand. And finally the rooftop equipment, because an array under Section 1505.9 and a landscaped area under Section 1505.10 each bring their own classification requirement onto a roof that otherwise met the table.
What this changes about comparing bids
A roof fire class is not a line item to negotiate. It is a constraint the assembly either satisfies or does not, and the useful work is making two proposals describe the same thing.
Ask which construction type the building is classified as, and ask for the source of that answer rather than the answer alone. A contractor who has read the permit record will say so.
Ask what class the proposed assembly is listed for, which approved testing agency listed it, and whether the listing covers the assembly as proposed, including the attachment method. A class that belongs to a mechanically attached assembly does not transfer to an adhered one by itself.
Ask whether any part of the proposed covering is nonclassified under Section 1505.5, and if so, on what basis it is permitted.
And if solar is anywhere in the building’s plans, even two years out, ask the roofing contractor and the solar contractor the same Section 1505.9 question and compare the answers. The array and the roof are read off one table, and they are usually priced by two companies who have never spoken.
What actually drives the cost here
Fire class is rarely a line item of its own on a commercial re-roof, and a bid that presents one as a priced upgrade is worth reading closely. What moves the number is the assembly as a whole: deck condition, how many existing layers come off, insulation thickness and taper, cover board, attachment method, the number of penetrations and curbs, roof access and staging, and the warranty term the owner wants behind it.
Where fire classification genuinely changes money, it tends to do so indirectly. A building classified in a type that requires Class B, carrying an existing assembly listed only to Class C, may need a different build-up than the like-for-like replacement the owner expected. A rooftop array that has to meet Class B rather than Class C may narrow the racking and module combinations available. Both of those are scope questions discovered by reading documents, and both are cheaper to find before the bids than after the contract.
Four mistakes this question produces
Treating “Class A” on a proposal as evidence of a better roof. Class A is permitted in all construction types and the table never requires it. It may be the right choice for other reasons. It is not, by itself, the code answer.
Guessing the construction type from the building’s appearance. Section 602.1.1 exists precisely because buildings commonly exceed the type they were classified as. The classification is a record, not an observation.
Letting the solar array be somebody else’s compliance problem. Section 1505.9 attaches a fire classification to the mounted system and reads its required class off the building’s construction type. An owner who never asks for that listing has no document showing the array was permitted to be there.
Accepting a class without the assembly it belongs to. The listing covers a tested combination. A membrane name is not an assembly, and an assembly changed in the field is not the one that was listed.
Before you sign
Pull the construction type out of the permit record first. It is one line, it decides the whole question, and it is the item every other answer depends on.
Then ask each bidder to name the listed assembly and its class in the proposal itself, not in a brochure attached to it. Two proposals naming two listed assemblies are comparable. Two proposals naming two membranes are not.
If rooftop solar is planned, get the UL 2703 classification for the specific racking and module combination in writing before anything is ordered, and check it against the construction type rather than against the roof’s own class.
And if the building’s own records are thin, which is common on older North Alabama industrial stock, a documented roof inspection and condition report is what turns guesswork into something a bidder can price. It is also what makes the difference between a straightforward replacement and tear-off and a scope change discovered on the second morning.
Our guide to recover or tear off covers which of those two routes the code allows for a particular building, and single-ply membranes and Table 1507.12.2 covers the material standards behind the membrane names.
The Huntsville Inspection Services office, on the first floor of City Hall at 305 Fountain Circle, is where the edition in force and any local amendment can be confirmed for a project inside the city limits; its published number is 256-427-5331.
This guide explains the code in plain language and is not legal advice. The state’s adopted minimum building standard code is identified above, but the authority issuing a permit is not always the state and local amendments apply, so the edition in force for your jurisdiction and the building official’s determination for a specific project control what is actually required. The fire classification standards named here are referenced standards rather than code text, and the current published versions govern.
Sources
- Alabama 2021 International Building Code, Chapter 15 — Roof Assemblies and Rooftop Structures. Section 1505.1 for the division into classes, the ASTM E108 and UL 790 testing requirement, ASTM D2898 for fire-retardant-treated wood coverings, the skylight and sloped glazing exception, and the requirement that minimum roof coverings comply with Table 1505.1 based on the type of construction; Table 1505.1 itself for the nine construction-type columns and the Class B and Class C minimums, together with its three footnotes covering the International Wildland-Urban Interface Code and Appendix D fire districts, nonclassified coverings on Group R-3 and Group U at a 6-foot fire-separation distance, and the two-story, 6,000-square-foot, 10-foot allowance for No. 1 cedar and redwood shakes; Sections 1505.2, 1505.3 and 1505.4 for the three class definitions, the approved testing agency listing requirement and the Class A assemblies named outright, including exposed concrete roof decks and 16-ounce copper sheets over combustible decks; Section 1505.5 for nonclassified roofing; Section 1505.7 for special purpose roofs; Section 1505.8 for building-integrated photovoltaic products; Section 1505.9 for rooftop mounted photovoltaic panel systems, UL 2703 and the Table 1505.1 compliance requirement; Section 1505.10 for landscaped roofs and ANSI/SPRI VF-1; and Sections 1506.1 and 1506.3 for application in accordance with the listing and for the approved testing agency labels on delivered packages and bulk shipments. Retrieved 27 October 2026.
- Alabama 2021 International Building Code, Chapter 6 — Types of Construction. Section 602.1 for the classification of buildings into the five construction types and the Table 601 fire-resistance requirement; Section 602.1.1 for the rule that a building need not conform to a higher type than its occupancy requires even where features do; Sections 602.2 through 602.5 for the definitions of Types I and II, Type III, Type IV and Type V; and the roof construction row of Table 601 for the 1-hour rating in Type IIA against zero hours in Type IIB. Retrieved 27 October 2026.
- Alabama 2021 International Building Code, Chapter 1 — Scope and Administration. Section 101.2.1, that provisions in the appendices do not apply unless specifically adopted, which is what governs the Appendix D fire district footnote to Table 1505.1. Retrieved 27 October 2026.
- Ala. Admin. Code r. 355-12-1-.01 — Adopted Standard Codes, Legal Information Institute, Cornell Law School. Paragraph (1) for the 2021 International Building Code as the minimum building standard code adopted by the Division of Construction Management, and for the named exceptions substituting or adding 2024 International Building Code provisions at the Chapter 2 flammable gas definition, Table 307.1(1), Sections 307.4, 307.5 and 414.2.5, Table 414.5.1, Section 414.2.5.4 and Table 414.2.5(3); and the rule’s own amendment history for the effective dates of 14 April 2022 and 17 March 2025. Retrieved 27 October 2026.
- City of Huntsville, Building & Inspection. The Inspection Services office location at 305 Fountain Circle and the published telephone number for permit and code enquiries inside the city limits. Retrieved 27 October 2026.
The code sections above are quoted from the Alabama adoption as published by UpCodes. Section numbers for roof fire classification have been stable across recent IBC editions, but the text is not always identical between them, so a project should be checked against the edition the jurisdiction has actually adopted.